Posted on Leave a comment

Point Work

I have to say a big thank you to Greg King for assembling all the point work for my layout.

Point blades being assembled.
Here I’ve started assembling the point work leading to one of the balloon loops. The middle road will be a storage siding at the terminus.
Leave a Reply

Your email address will not be published. Required fields are marked *